The Palazzetto dello Sport in Via Ferruccio Parri, the beating heart of the Boschetto Sports Center, is undergoing a real transformation. The City of Curtatone has approved a decisive intervention to make the structure more modern, efficient and sustainable, improving the experience of all users, from children to professional athletes.
But what has actually changed?
- Replacement of lighting devices with LED lights: a choice that not only reduces energy consumption, but that actively contributes to making the system greener and more environmentally friendly.
- Lighting of the playing area appropriate to the C.O.N.I. regulations: better conditions for athletes and teams, who can now train and compete in a safer, well-lit environment.
- Emergency lighting upgrade: safety is a top priority, and this intervention makes it even more solid, protecting everyone inside the building.
- Installation of an electric charging point: a small but important step towards greater environmental sustainability, which responds to the growing attention to the use of clean energy.
This project, worth 90,000 euros and fully funded with ministerial contributions, was designed to make the Palazzetto an increasingly modern and welcoming reference point for the community. The works were completed in February 2025, and the result is a structure that looks to the future, with a lighter ecological footprint and an offer that is increasingly adapted to the needs of sportsmen and citizens.
An intervention that not only concerns the physical improvement of the system, but also the quality of life for those who live in sport, who can now enjoy a safer, more sustainable and comfortable space. A better future for our young talents and for all those who choose to experience sport.